Interior finishes (plaster, ceilings, tiling)
For plasterers, ceiling fixers, tilers, floor finishers. Your trade's documents, filled in with your details, at the level of work you do.
Coming soon. Register your interest now.
Domestic
Domestic trades, small builders' subbies.
65 documents
Light Commercial
Commercial trades on smaller jobs.
76 documents
Heavy Commercial
Trades on Tier 1 / Tier 2 sites.
102 documents
Your trade's documents
Trade SWMS (15)
- Plasterboard Installation
- Ceiling Grid Tile Installation
- Bulkheads Feature Ceilings
- Elevated Work Platforms Internal
- Manual Handling Sheets Frames
- Suspended Ceiling Installation
- Insulation Installation
- Wall Lining Installation
- Stone Benchtop Installation
- Carpet Installation
- Vinyl Flooring Installation
- Epoxy Flooring Installation
- Wall Paper Installation
- Sealant Application
- Floor Sanding and Polishing
High risk construction work SWMS (4)
- Work at Heights
- Mobile Scaffold Use
- Silica Dust Exposure
- Hazardous Chemicals Handling
Inspection and test plans (11)
- Wall Framing & Setout ITP
- Plasterboard Installation ITP
- Ceiling Grid Installation ITP
- Finishing, Stopping & Sanding ITP
- Final Wall & Ceiling Inspection ITP
- Insulation Installation ITP
- Floor Coverings Installation ITP
- Floor Tiling Substrate Preparation ITP
- Floor and Wall Tile Installation ITP
- Tiling Grout and Sealant Application ITP
- Tiling Completion and Finish Inspection ITP
In every interior finishes (plaster, ceilings, tiling) package
Core site forms and registers (22)
- Worker Site Induction
- Contractor / Trade Induction
- Induction Acknowledgement Declaration
- Daily Pre-Start and Coordination Record
- Toolbox Talk Attendance Record
- Pre-Task Risk Assessment / JSEA
- Hazard / Near Miss Report
- Incident & Injury Report
- First Aid Treatment Record
- Site Safety Inspection Checklist
- Plant & Equipment Inspection
- PPE Inspection Checklist
- High-Risk Construction Work SWMS Review and Verification Record
- Trade SWMS Register
- Training & Competency Register
- High-Risk Work Licence Register
- Plant & Equipment Register
- Test & Tag Register
- Chemicals & SDS Register
- Trade ITP Register
- Non-Conformance Report
- Fitness for Work Declaration
Defects, NCRs and quality policy (4)
- Defect Report
- Defect Rectification Verification
- NCR Register
- Quality Policy
Management Lite: policy, competency, workforce and prequalification (9)
- Occupational Health & Safety Policy
- Policy Review & Approval Record
- Competency & Training Needs Analysis
- IMS Awareness Training Record
- Worker Consultation Record
- Verification of Competency (VOC) Assessment
- Supplier / Subcontractor Evaluation Record
- Subcontractor Prequalification Questionnaire
- Supplier and Subcontractor Onboarding Checklist
Environmental Essentials: waste, spills, dust and noise (Light Commercial and Heavy Commercial) (11)
- Environmental Policy
- Environmental Emergency Response Arrangements (Spills/Leaks)
- Erosion & Sediment Control Inspection
- Noise Monitoring Log
- Dust Monitoring Log
- Waste Segregation Inspection
- Dangerous Goods / Chemical Storage Inspection
- Waste Transport / Docket Capture Record
- Waste Management Register
- Environmental Controls Register (ESCP, noise, dust etc.)
- Vibration Monitoring Log
Tier 1 safety core (Heavy Commercial) (24)
- Return to Work Plan
- Suitable Duties and Suitable Employment Offer Record
- RTW Case Review Record
- Pre-Task Risk Assessment / JSEA
- Isolation / Lockout Tagout Permit
- Excavation, Penetration and Services Permit
- Work at Heights Permit and Verification Record
- Lift Plan and Critical Lift Permit
- Silica Hazard Control Statement and HRCSW Control Record
- Respiratory Protection Fit Test and Issue Record
- Asbestos Discovery and Disturbance Report
- Emergency Management Plan
- Permit to Work Procedure
- Hazardous Chemicals Management Plan
- Asbestos Management Procedure
- Crystalline Silica and Respirable Dust Management Procedure
- Traffic and Mobile Plant Interaction Management Plan
- Safety Risk Management and Task Risk Assessment Procedure
- Return to Work Policy
- Fitness for Work Policy
- Drug & Alcohol Policy
- Emergency Wardens / First Aiders Register
- Asbestos Register
- Health Monitoring Trigger Register
Tier 1 contractor assurance (Heavy Commercial) (2)
- Trade and Contractor Compliance Matrix
- Project Interface Responsibility Matrix
Documents are reviewed against legislative change every 6 months; new revisions are pushed to you.